Projects

Subcontract  Projects

1- Pavement Road of “Bayt ALshawi” a length of 6 km Maintenance and Pavement Om Alshwej 12 km
2- Paving the road in Aladhbah in Qurna 4 km
3- Construction Paving an alternative route for farmers in Zubair / Alburjesia 3 km
4- Construction concrete terms for the benefit of the Southern Oil Company
5- Sports City processing textured boulder gravel quantity of 30000 m 2
6- Advances work for the passage of the pipeline for the benefit of the Southern Oil Company
7- Sports City Basra crushed the amount of processing 38,000 m3
8- Set up in the net protected by a length of 22 km
9- Sports city in Basra processing gravel runway and the amount of 50,000 m 3
10- Pavement dinars Street from the intersection of River Amuftih to ditch

Completed Projects
1- Maintenance Basra _ FAW by length (6 km).
2- Pavement dinars Street intersection Amuftih length of the river to the trench.

3- Ways to revive the marshes in the province of Basra hand Hartha first thread and the second zone.
4- Maintenance Qurna / Ezzedine Salim / city along the road (11.5 km)

5- The establishment of the alternative route for farmers in Albrjsuh length (3 km)

Ongoing Projects
1- Maintenance through metal hand Safwan 8,250 km

2- Maintenance of the road link between the road (Basra-Safwan) and by (Safwan -nasria) 8250 km

3- Paving the streets of the thread area and bayonet thread length of 8 km / Hartha

New Projects
1- Supplying of materials to sustain the operation of the water and networking projects in the province

2- Maintenance of Minerals Road, Safwan Dist. , Length 8,250 Km

3- Maintenance of the Narrow Road between Basra-Safwan and Safwan-Nasria

4- Street Paving of AL KHAIT Dist. ,AL HARTHA , Length 8 Km

5- Street Paving for Dinar Street from AL MUFTIA Crossing to The Ditch River
6- Tender (23/2011)
Project (Maintenance Basra – AL Faw Road ,Length 5 km)

7- Tender (161/40/2013)
Project
(The contract of Iraqi Marshlands Project’s Road in Basra)

8- Tender
(21/C/2013)
Project
9- (Maintenance of AL Qurna – Eiz AL Deen Saleem / Mdainah , Length 11,5 Km)
10- Street Paving for Dinar Street from AL MUFTIA Crossing to The Ditch River
11- The work contract numbered Ll3lBl2O10 regarding

12- The( construction of the alternative road to farmers in Al Burjesia )
Street Paving for Dinar Street from AL MUFTIA Crossing to The Ditch River